① Pop-up Cooling Node
Already in place
- MOM already expects shaded rest areas near the work and cool drinking water. The node is a better version of something sites must provide anyway.
- Sites already run a WBGT meter, so the node doesn't need its own.
- Sites already have temporary power for tools.
What it needs
- The site electrician connects the fridge and cooler to the site's power board. Without power, run it on the ice box and jug only.
- A spot off crane lift zones and vehicle routes.
Watch-outs
- Squalls: weight every leg and strap it down. Fold it during lightning alerts, when outdoor work stops anyway.
- Someone must restock ice and drinks daily. Make it a named duty.